top of page

Flooring Installation

Level, quiet, and built to last—tile, laminate, and luxury vinyl done with precision.

Installing Wooden Flooring

What's included

  • Large-format porcelain/ceramic tile (24×48, 36×36, etc.)

  • Mosaic accents, shower floors, niches

  • LVP/LVT click or glue-down; base & transitions

  • Subfloor prep (leveling/patching) and crack isolation membranes

Our Process(step-by-step)

  • Site check & moisture testing – confirm substrate suitability.

  • Surface prep – leveling, underlayment, layout planning.

  • Install – proper trowel sizes, spacers/leveling systems, clean joints.

  • Grout & seal – as specified for tile; expansion gaps for LVP.

  • Base/trim & cleanup – ready for furniture.

Timeline & Investment

  • Timeline: Kitchens or living areas: 1–3 days for LVP; tile varies with layout and cut complexity.

  • Pricing: Pricing depends on material size, patterns, and prep requirements.

Send us your room size and tile/plank choice—we’ll quote the full install.

bottom of page